CS-031: COMBINED CYCLE POWER PLANT

This case study demonstrates the modeling of a Combined Cycle (CC) power plant of a High Temperature Gas-Cooled Reactor (HTGR). The nuclear reactor is not modeled in detail as the focus of this case study is not on the reactor but on the CC Power Conversion Unit (PCU).
Share This:
Share This:
More Case Studies
You might also be interested in these CASE STUDIES
CS-047: COALESCING FILTER SIZING AND LIFE CYCLE ANALYSIS USING RATED AND SPECIFIED PRESSURE LOSS COMPONENTS
This case study discusses the sizing of a coalescer filter and demonstrates its fouling life cycle analysis using a Flownex® model which implements two new pressure loss components:
CS-046: BASIC IMMERSION FIRETUBE MODEL
This case study demonstrates the implementation of a basic immersion fire-tube model in Flownex and…
CS-045: MAINTENANCE EFFECTIVENESS COMPARISON FOR A HALF STATION SHUTDOWN OUTAGE
This case study demonstrates how Flownex® can be used in evaluating the effectiveness of the maintenance work conducted during a half station shutdown outage by characterising a unit
CS-044: Fouling Factors in Flownex Heat Transfer Models
This case study demonstrates the implementation of two methods to account for thermal fouling factors in heat transfer piping and tubing…
CS-043: EXTERNAL HEAT TRANSFER PIPE
This case study demonstrates the implementation of a compound element with external surface heat transfer to or from an external fluid. The heat transfer …
CS-042: THE SIZING OF PRESSURE CONTROL AND PRESSURE SAFETY VALVES INCLUDING REACTION FORCE CALCULATION
This case study demonstrates the use of Flownex® to size properly performing pressure control valves for typical plant operation and to size and…