USING FLOWNEX AS A TOOL TO DEVELOP NEW ENGINEERING METHODS AND CORRELATIONS FOR STEAM TURBINE PERFORMANCE PREDICTION

This case study demonstrates the ability of Flownex® to be used as a tool to develop, test and implement new correlations and methods used in the prediction of steam turbine performance. Flownex® empowers the user to quickly carry out multiple tests and parameter studies, saving time and money.
Share This:
Share This:
More Case Studies
You might also be interested in these CASE STUDIES
MAINTENANCE EFFECTIVENESS COMPARISON FOR A HALF STATION SHUTDOWN OUTAGE
This case study demonstrates how Flownex® can be used in evaluating the effectiveness of the maintenance work conducted during…
TURBINE PROTECTION – TWO PHASE FLOW REGIMES
The main challenge explored in this case study is root cause analysis of dynamically hazardous movements in the distillate lines to…
RECOVERING GENERATION LOSSES DUE TO FAULTY AIR HEATER OPERATION
Faulty systems operation results in significant power generation losses. The purpose of this case study is to communicate a case where…
GENERATOR SEAL OIL SYSTEM
Eskom power utility utilized Flownex® SE simulation capabilities to mitigate system shutdowns caused by Generator Hydrogen (H2) Seal ring failures…
BOILER TUBE FAILURE THERMOHYDRAULIC ANALYSIS
The boiler hopper tubes at an Eskom Power Station suffer from continuous mechanical failures that lead to frequent unplanned maintenance…
BOILER HEADER CRACKING
As part of the repowering of a power station Steinmüller is tasked with the optimization of the boiler sub-system. This included a study to determine…