CS-057: Integrated Systems Modeling for a CO2-Emissions Free Alkaline Water Electrolysis Cycle in Flownex SE
This case study used Flownex to model the interactions within electrolyte loops and gas systems for McPhy Energy Germany GmbH. The model assessed piping, process equipment, and control devices to optimize hydrogen and gas production systems.
Share This:
Share This:
More Case Studies
You might also be interested in these CASE STUDIES
CS-081: Exhaust Gas Recirculation on Gas-Turbine Engine
This case study shows how Flownex was used to evaluate and optimize condensate extraction pump (CEP) flow control at a 4100 MW coal-fired power station. The plant originally
CS-078: Emergency Vent Flare Ice Build-Up Estimation
This case study shows how Flownex was used to evaluate and optimize condensate extraction pump (CEP) flow control at a 4100 MW coal-fired power station. The plant originally
CS-077: Optimization of condensate extraction pump’s flow control
This case study shows how Flownex was used to evaluate and optimize condensate extraction pump (CEP) flow control at a 4100 MW coal-fired power station. The plant originally
CS-075: Optimising combustions and heat recovery in a thermal oxidiser
Fire protection systems are installed in power stations, petrochemical plants, warehouses, etc. to extinguish or suppress a fire.
This case demonstrates a transient analysis of the boiler head
CS-074: Transient Analysis of a Boiler Fire Safety System
Fire protection systems are installed in power stations, petrochemical plants, warehouses, etc. to extinguish or suppress a fire.
This case demonstrates a transient analysis of the boiler head
CS-072: Thermal-fluid Modelling of the Transient Behaviour of a Capacity-Controlled Underground Refrigeration Unit
The modular and mobile Air-Cooling Unit (ACU) was developed to perform spot cooling in remote underground locations for where traditional cooling approaches proved less effective. Flownex was used