Home → Case Studies → power generation → THERMO HYDRAULIC BOILER MODEL
THERMO HYDRAULIC BOILER MODEL

The boiler hopper tubes at an Eskom Power Station suffer from continuous mechanical failures that lead to frequent unplanned maintenance. Using Flownex® SE coupled to ANSYS, various hypotheses to the cause of these failures could be examined without affecting plant operations. The project involved several first of its kind engineering practices, which included: the first full transient detailed thermal flow model done on a complete sub-cooled boiler section wall at near real-time modelling and the first large scale interactive communication between thermo-hydraulic systems CFD and structural analysis software.
Share This:
REQUEST FULL CASE STUDY
More Case Studies
You might also be interested in these CASE STUDIES
TURBINE PROTECTION – TWO PHASE FLOW REGIMES
The main challenge explored in this case study is root cause analysis of dynamically hazardous movements in the distillate lines to…
MCPHY WATER ELECTROLYSIS CYCLE
McPhy Energy Germany GmbH designs, develops, manufactures and sells technical systems and components for energy systems and auxiliaries…
UCT STEAM TURBINE PERFORMANCE PREDICTION
This case study demonstrates the ability of Flownex® to be used as a tool to develop, test and implement new correlations and methods…
RECOVERING GENERATION LOSSES DUE TO FAULTY AIR HEATER OPERATION
Faulty systems operation results in significant power generation losses. The purpose of this case study is to communicate a case where…
HALF STATION SHUTDOWN OUTAGE
This case study demonstrates how Flownex® can be used in evaluating the effectiveness of the maintenance work conducted…
BLOW-OFF VALVES
A blow-off test to determine compressor performance during part load conditions is required at a newly built compressor plant…