RECOVERING GENERATION LOSSES DUE TO FAULTY AIR HEATER OPERATION

Faulty systems operation results in significant power generation losses. The purpose of this case study is to communicate a case where Flownex® served in the detection of a fault that resulted in an improvement of 5% in the generation load of a power plant after correcting the fault. This case focuses on the Draught Group of a power plant that was developed in Flownex®.