MAINTENANCE EFFECTIVENESS COMPARISON FOR A HALF STATION SHUTDOWN OUTAGE
MAINTENANCE EFFECTIVENESS COMPARISON FOR A HALF STATION SHUTDOWN OUTAGE

This case study demonstrates how Flownex® can be used in evaluating the effectiveness of the maintenance work conducted during a half station shutdown outage by characterising a unit and comparing the performance of the unit with data before and after the outage.
Share This:
Share This:
More Case Studies
You might also be interested in these CASE STUDIES
HTGC REACTOR STARTUP
The HTGR is one of the most promising reactor concepts of the Nuclear Renaissance, offering advantages such as improved safety and…
A CLOSED THREE-SHAFT RECUPERATIVE BRAYTON CYCLE
This case study demonstrates the investigation into the operating characteristics of a Reactor Cavity Cooling System (RCCS) during…
INSULATION FLOW BALANCING
This case study investigates the balancing of forced flow through a perforated flow distribution manifold situated between the thermal…
REACTOR CAVITY COOLING
This case study demonstrates the investigation into the operating characteristics of a Reactor Cavity Cooling System (RCCS) during…
COMBINED CYCLE POWER PLANT
This case study demonstrates the modeling of a Combined Cycle (CC) power plant of a High Temperature Gas-Cooled Reactor (HTGR).
HTGC POWER CYCLE
This case study demonstrates the steady-state simulation of a High Temperature Gas-Cooled Reactor (HTGC) nuclear power plant (NPP).