Logo

MINING SOLUTIONS

Mine ventilation network

REFRIGERATION & HEATING SYSTEM SIMULATION

  • Heat load calculations

  • Heat exchanger sizing

  • Energy optimization

  • Vapour compression cycle simulation

  • Environment - Cooling Tower ‒ Plant Matching

 

WATER HANDLING SYSTEM SIMULATION

  • Pump, water turbine and pipe sizing
  • Water hammer analysis and prevention
  • Water reticulation system design
  • Flow balancing
  • Pipe heat transfer
 

VENTILATION

  • Fan sizing.

  • Flow distribution and balancing.

  • Overall integration with cooling or heating system.

  • Contaminant tracking.

  • Ventilation temperature increase with depth (auto compression).

  • Psychrometric calculations (moist air).

 

COMPRESSED AIR SIMULATION

  • Reticulation system design and pipe sizing.

  • Compressor selection.

  • Energy optimization.

  • Heat exchanger sizing (inter- and after coolers).

 

BACKFILLS & TAILINGS

  • Pump and pipe sizing

  • Blockage avoidance


Mining 2